top of page
Technical Requirements
For the performance the following requirements are needed:
-
The ground clearance at the venue should be at least 5.50 m.
-
The clamping ring has to be attached to a fixed point which can hold of a minimum of 1 T.
-
In addition to that a radius of 3 meters of free space has to be available.
bottom of page